Important Note
1. 1 site consider Ping (www.google.co.in).
2. DL & UL Consider success,Timeout.
3. DL Consider Attempt (event_id=20801) and Dl Complete consider event_id (20805) and Fail consider attempt - success.
4. UL Consider Attempt (event_id=20851) and UL complete consider event_id (20854).
5. Streaming total buffer delay Consider success(event_id = 20408) and fail(event_id = 20409).
6. CQI,PRB,RSRP,RSRQ,SINR. basic on Raw.
7. CQI <7.